Phase 3

The Dig More digging Boulders arrive Digging the keywall trench Steel Plumbing
Gunite Placing the boulders Trench work Tile and coping Deck drain and retaining wall Perimeter wall
Stairs Stucco

Phase 3:  The boulders that will be incorporated into the perimeter of the pool are delivered.


The middle white and gold rock is 6 feet long and weighs 4,000 pounds

A crane will place them around the pool up above
This page was updated last on 5/25/02