Phase 4

The Dig More digging Boulders arrive Digging the keywall trench Steel Plumbing
Gunite Placing the boulders Trench work Tile and coping Deck drain and retaining wall Perimeter wall
Stairs Stucco

Phase 4:  An engineer advises us to reinforce the lower bank pool wall with a key wall ~ which necessitates handdigging a two-foot deep by                   sixteen-inch wide footing, and six inches deeper halfway into the pool.


Going at it with a jackhammer

Almost half done

Otto drives down from L.A. to help

Double the fun with two jackhammers

The trench is completed

The white line indicates the area that needs to be dug six inches deep

John in the trench

The rest of the digging is done, whew!