Phase 5

The Dig More digging Boulders arrive Digging the keywall trench Steel Plumbing
Gunite Placing the boulders Trench work Tile and coping Deck drain and retaining wall Perimeter wall
Stairs Stucco

Phase 5:  Reinforcing steel


Steel crew in action

All the rebar in place

Detail shot of the keywall

An artistic view
This page was updated last on 5/25/02