Phase 9
The Dig
More digging
Boulders arrive
Digging the keywall trench
Steel
Plumbing
Gunite
Placing the boulders
Trench work
Tile and coping
Deck drain and retaining wall
Perimeter wall
Stairs
Stucco
Phase 9:
All the trench work for the main water line, electrical lines, and the water line to the solar panels on the roof
Struggling with the trencher
Giving up with the trencher
Plumbing and electrical lines up at the house
Elecrical line into the house
The
very
deep trench at the base of the hill
A view from the top of that
very
deep trench
Some of the plumbing and electrical installed
More plumbing installed
The water lines to the bar and a waterfalls
This page was updated last on 3/29/03