Latest Pool Improvements
The bar under construction:
Steel frame with cabinet
boxes installed
Steel frame
CD/DVD cabinet, space for
refrig.,and booze cabinet
Steel frame
The completed bar:
front view
side view
side view
close up view of
speaker cabinets
CD player cabinet (with no
door yet), refrigerator,
and booze cabinet
Sink, side burners,
and grill
rear view
rear view
groovy lights
bar lights (taken without
a flash)
bar lights (taken with
a flash)
groovy lights
The stone tiles on the stairs:
Top of stairs
Top of stairs
Bottom of stairs
Bottom of stairs
The flag stones and fenced-in equipment pad:
Flagstone
Flagstone
Equipment enclosure
An overview:
Structurally speaking, the only thing left now is to finish the pergola.
This page was updated last on 9/11/09